Electric train for 137-kilometer long Baramulla-Banihal railway corridor is all set to be inaugurated on 2 October with the work going on at full swing.
The Kashmir Walla plans to extensively and honestly cover — break, report, and analyze — everything that matters to you. You can help us.
Electric train for 137-kilometer long Baramulla-Banihal railway corridor is all set to be inaugurated on 2 October with the work going on at full swing.