50-kms Baramulla-Uri railway line in offing, tenders floated: Officials

The Kashmir Walla needs you, urgently. Only you can do it.

The Kashmir Walla plans to extensively and honestly cover — break, report, and analyze — everything that matters to you. You can help us.

Most Read This Week

In a significant development, the northern railways is all set to start work on the 50-kilometers Baramulla- Uri stretch in Kashmir, for which tenders have been floated, officials said on Sunday.

Once the project is completed, the border area of Uri will get connected with the railways.

A top railway said that Northern Railways is mulling to begin Final Location Survey (FLS) for new Baramulla-Uri line and for which proposals are being invited by the Ministry.

“Tenders have been floated for Engineering survey work of a Railway line/roadway using modern survey techniques such as Aerial Survey (Aerial Photogrammetric survey or Aerial LIDAR) and DGPS (Differential Global Positioning System) levelling and creation of DEM”, he said.

He said that the overall track from Baramulla to Uri will be 50 kilometres, he said.

Chief Area Manager (CAM) Kashmir Railways, Saqib Yousuf also confirmed the development. He said it is good news for the entire Kashmir. Pertinently, the government has stated that Kashmir will be connected with Kanyakumari through rail link. (KNO)

Choose a plan as per your location

Latest News

Stop teaching during school hrs or face action: ADC Sopore warns coaching centres

The authorities on Saturday warned coaching institutions, operating in Sopore town of north Kashmir’s Baramulla district, of strict action...

More Articles Like This